    welcome to the National Commission
  • 0:08 - 0:11
    crane operators tower crane operator
  • 0:11 - 0:15
    practical exam if there is anything in
  • 0:15 - 0:17
    this video you do not understand please
  • 0:17 - 0:19
    request clarification from the practical
  • 0:19 - 0:21
    examiner
  • 0:21 - 0:24
    the NCCC Oh tower crane operator
  • 0:24 - 0:27
    practical exam consists of the following
  • 0:27 - 0:29
    tasks
  • 0:36 - 0:39
    there is also a pretest briefing a
  • 0:39 - 0:42
    pretest familiarization period and pre
  • 0:42 - 0:44
    task familiarization period prior to
  • 0:44 - 0:47
    task two
  • 0:47 - 0:49
    before taking the exam you will be
  • 0:49 - 0:51
    informed of the make and model of the
  • 0:51 - 0:54
    crane the jib length and the weight of
  • 0:54 - 0:57
    the test weight while you wait for your
  • 0:57 - 1:00
    opportunity to test you will be provided
  • 1:00 - 1:02
    sufficient time to read the descriptions
  • 1:02 - 1:04
    of the tasks you need to perform and to
  • 1:04 - 1:06
    review the operator's manual and load
  • 1:06 - 1:08
    charts for the crane you will be
  • 1:08 - 1:10
    operating
  • 1:10 - 1:13
    if the crane is equipped with an LM I it
  • 1:13 - 1:14
    has been programmed in accordance with
  • 1:14 - 1:17
    the manufacturer's instructions and is
  • 1:17 - 1:20
    functioning properly
  • 1:20 - 1:22
    the crane you will operate has been set
  • 1:22 - 1:26
    up and leveled prior to testing no part
  • 1:26 - 1:28
    of the course has been placed at a
  • 1:28 - 1:30
    radius that exceeds the cranes rated
  • 1:30 - 1:32
    capacity
  • 1:32 - 1:35
    for self-erecting tower cranes the jib
  • 1:35 - 1:39
    length has been preset the test site
  • 1:39 - 1:41
    coordinator is responsible for setting
  • 1:41 - 1:45
    the test schedule for the day once
  • 1:45 - 1:47
    you've completed all your tests you must
  • 1:47 - 1:51
    leave the test area if you wish to
  • 1:51 - 1:53
    retest you will be required to re
  • 1:53 - 1:57
    register and pay the test fees again
  • 1:57 - 1:59
    the only personnel allowed in the test
  • 1:59 - 2:01
    area are those who are actively involved
  • 2:01 - 2:03
    in the administration of the practical
  • 2:03 - 2:07
    exam you are under the supervision of
  • 2:07 - 2:09
    the practical examiner and must follow
  • 2:09 - 2:11
    their instructions and signals at all
  • 2:11 - 2:15
    times the examiner has the authority to
  • 2:15 - 2:17
    stop the tests if you operate in an
  • 2:17 - 2:21
    unsafe manner note that all hand signals
  • 2:21 - 2:23
    used during the exam will be in
  • 2:23 - 2:25
    accordance with OSHA's standard method
  • 2:25 - 2:28
    hand signals
  • 2:29 - 2:33
    pre-operational shift inspection
  • 2:34 - 2:37
    the first part of the practical exam
  • 2:37 - 2:39
    will be an evaluation of your ability to
  • 2:39 - 2:41
    identify elements critical to a Crane's
  • 2:41 - 2:46
    pre-operational shift inspection the
  • 2:46 - 2:48
    examiner will ask you to describe how
  • 2:48 - 2:49
    you would inspect five different areas
  • 2:49 - 2:52
    related to the machine
  • 2:52 - 2:55
    you will have approximately one minute
  • 2:55 - 2:57
    per item
  • 3:00 - 3:04
    pretest familiarization period
  • 3:05 - 3:08
    you will be allowed 15 minutes to
  • 3:08 - 3:09
    familiarize yourself with the crane and
  • 3:09 - 3:12
    to examine anything on it that you feel
  • 3:12 - 3:14
    as necessary to operate it comfortably
  • 3:14 - 3:17
    you are allowed to get the feel of the
  • 3:17 - 3:19
    controls and are permitted to run the
  • 3:19 - 3:22
    crane through its functions the brakes
  • 3:22 - 3:24
    and other devices have been set
  • 3:24 - 3:25
    according to the crane manufacturer's
  • 3:25 - 3:28
    recommendations
  • 3:28 - 3:30
    you may not interfere with the test
  • 3:30 - 3:33
    course attempt to lift the test weight
  • 3:33 - 3:37
    or shadow the corridor
  • 3:38 - 3:40
    you must finish the pretest
  • 3:40 - 3:42
    familiarization period with a hook under
  • 3:42 - 3:44
    control in the start circle in
  • 3:44 - 3:48
    preparation for task 1
  • 3:48 - 3:50
    the examiner will notify you when there
  • 3:50 - 3:55
    are 10 5 and 1 minutes remaining if you
  • 3:55 - 3:57
    are ready before the full 15 minutes
  • 3:57 - 4:00
    have passed you may indicate this to the
  • 4:00 - 4:03
    examiner if at the end of the pretest
  • 4:03 - 4:05
    familiarize ation period you feel you
  • 4:05 - 4:07
    are not ready to take the exam you
  • 4:07 - 4:10
    should notify the examiner you will have
  • 4:10 - 4:11
    disqualified yourself from taking the
  • 4:11 - 4:14
    exam at this time and you will be
  • 4:14 - 4:16
    required to sign to that effect on the
  • 4:16 - 4:18
    candidate score sheet
  • 4:18 - 4:21
    if you are using a remote control you
  • 4:21 - 4:23
    are required to stay inside the
  • 4:23 - 4:25
    designated area while operating the
  • 4:25 - 4:29
    crane during the exam at no time during
  • 4:29 - 4:31
    the familiarization period or test
  • 4:31 - 4:34
    should you walk or stand underneath the
  • 4:34 - 4:36
    test wait
  • 4:36 - 4:38
    walking or standing underneath the test
  • 4:38 - 4:41
    weight is considered an unsafe act and
  • 4:41 - 4:43
    the examiner is required to stop the
  • 4:43 - 4:45
    test
  • 4:45 - 4:47
    if your time during any of the tasks
  • 4:47 - 4:50
    exceeds more than twice the optimum time
  • 4:50 - 4:52
    the examiner may ask you to stop and
  • 4:52 - 4:55
    move on to the next task
  • 4:55 - 4:59
    tasks one load hook and chain and stop
  • 4:59 - 5:03
    circle optimum time for this task
  • 5:03 - 5:06
    is one minute 30 seconds
  • 5:06 - 5:09
    at the examiner's indication to start at
  • 5:09 - 5:11
    which point timing will begin raise the
  • 5:11 - 5:13
    chain at least ten feet off the ground
  • 5:13 - 5:17
    to clear all obstacles and personnel
  • 5:17 - 5:19
    bring the chain from its starting
  • 5:19 - 5:21
    position at the start circle over to the
  • 5:21 - 5:24
    stop circle and land the chain fully
  • 5:24 - 5:26
    inside the circle
  • 5:26 - 5:29
    once the chain makes contact with the
  • 5:29 - 5:31
    ground inside the circle do not lift the
  • 5:31 - 5:35
    chain off the ground avoid contacting
  • 5:35 - 5:37
    anything but the ground inside the stop
  • 5:37 - 5:40
    circle once the chain is under control
  • 5:40 - 5:43
    inside the circle the examiner will give
  • 5:43 - 5:46
    you a stop signal and timing will end
  • 5:46 - 5:48
    points will be deducted for the
  • 5:48 - 5:50
    following
  • 5:50 - 5:53
    dragging more contacted the chain
  • 5:53 - 5:57
    outside of the circle hook or block
  • 5:57 - 6:00
    touching the ground either inside or
  • 6:00 - 6:02
    outside of the circle
  • 6:03 - 6:05
    hook block or chain contacting any part
  • 6:05 - 6:10
    of the course or crane lifting the chain
  • 6:10 - 6:12
    off the ground after initial contact
  • 6:12 - 6:15
    with the ground inside the circle
  • 6:15 - 6:19
    exceeding optimum time
  • 6:24 - 6:27
    pre-task familiarization period with
  • 6:27 - 6:31
    test weight at the examiner's indication
  • 6:31 - 6:33
    bring the load hook over to the test
  • 6:33 - 6:35
    weight
  • 6:35 - 6:38
    the examiner or Proctor will remove the
  • 6:38 - 6:43
    chain and attach the test weight you are
  • 6:43 - 6:44
    allowed to bring the test weight to the
  • 6:44 - 6:46
    designated area where you can get the
  • 6:46 - 6:48
    feel of the load test the brakes and so
  • 6:48 - 6:52
    on before beginning the next task
  • 6:52 - 6:54
    do not swing the load outside of the
  • 6:54 - 6:57
    designated area or shadow the load
  • 6:57 - 7:00
    circle or zigzag corridor you will be
  • 7:00 - 7:02
    allowed 5 minutes for this pre task
  • 7:02 - 7:05
    familiarization period
  • 7:05 - 7:07
    at the end of this period you must have
  • 7:07 - 7:09
    placed the test weight on the ground in
  • 7:09 - 7:11
    the test weight circle with the rigging
  • 7:11 - 7:15
    taught the examiner will notify you when
  • 7:15 - 7:17
    there is one minute remaining
  • 7:17 - 7:19
    if you are ready before the full five
  • 7:19 - 7:21
    minutes have passed you may indicate
  • 7:21 - 7:25
    this to the examiner
  • 7:26 - 7:30
    task to test weight in load circle
  • 7:30 - 7:34
    optimum time four minutes
  • 7:34 - 7:37
    at the examiner's indication to start at
  • 7:37 - 7:40
    which point timing will begin bring the
  • 7:40 - 7:42
    test weight from the test weight circle
  • 7:42 - 7:46
    to the load circle place the test weight
  • 7:46 - 7:48
    on the ground completely within the load
  • 7:48 - 7:51
    circle
  • 7:52 - 7:54
    once the test weight is on the ground
  • 7:54 - 7:56
    completely inside the circle the
  • 7:56 - 7:58
    examiner will give you a stop
  • 7:58 - 8:02
    hoist and swing signal
  • 8:02 - 8:04
    this will indicate that you should then
  • 8:04 - 8:06
    pick the test weight up and move it over
  • 8:06 - 8:08
    to the start circle
  • 8:08 - 8:10
    timing will end when you have placed the
  • 8:10 - 8:11
    test weight on the ground completely
  • 8:11 - 8:15
    inside the start circle and the examiner
  • 8:15 - 8:18
    has given you a stop signal if the
  • 8:18 - 8:20
    examiner has not given you a stop signal
  • 8:20 - 8:21
    this will indicate that the test weight
  • 8:21 - 8:24
    is not fully within the circle and the
  • 8:24 - 8:27
    task continues to be timed
  • 8:27 - 8:30
    avoid touching or knocking over any part
  • 8:30 - 8:32
    of the PVC barriers or touching the
  • 8:32 - 8:34
    ground outside of the circle with the
  • 8:34 - 8:38
    test weight points will be deducted for
  • 8:38 - 8:41
    the following
  • 8:41 - 8:46
    knocking ball off pole knocking pole
  • 8:46 - 8:50
    over test wait touching the ground
  • 8:50 - 8:55
    outside of the circle exceeding optimum
  • 8:55 - 9:05
    time task three zigzag corridor
  • 9:07 - 9:10
    this task is divided into two separate
  • 9:10 - 9:17
    subtasks 3a and 3b task 3a requires you
  • 9:17 - 9:20
    to negotiate the corridor in a forward
  • 9:20 - 9:24
    direction task 3b requires you to
  • 9:24 - 9:26
    negotiate the corridor in a reverse
  • 9:26 - 9:28
    direction
  • 9:28 - 9:31
    the optimum time for each individual sub
  • 9:31 - 9:35
    task is three minutes
  • 9:38 - 9:41
    at the examiner's indication to start at
  • 9:41 - 9:43
    which point timing will begin lift the
  • 9:43 - 9:45
    test weight and guide it through the
  • 9:45 - 9:47
    corridor
  • 9:47 - 9:50
    avoid touching or knocking over any part
  • 9:50 - 9:52
    of the PVC barriers touching the ground
  • 9:52 - 9:55
    with a test weight or raising it so high
  • 9:55 - 9:58
    that the chain leaves the ground
  • 9:58 - 10:01
    timing will end when you have placed the
  • 10:01 - 10:03
    test weight on the ground inside the
  • 10:03 - 10:05
    stop circle and the examiner has given
  • 10:05 - 10:08
    you a stop signal
  • 10:08 - 10:10
    if the examiner has not given you a stop
  • 10:10 - 10:12
    signal this will indicate that the test
  • 10:12 - 10:14
    weight is not fully within the circle
  • 10:14 - 10:18
    and the task continues to be timed
  • 10:18 - 10:21
    for this task the chains do not need to
  • 10:21 - 10:24
    be fully inside the circle
  • 10:24 - 10:29
    poins will be deducted for the following
  • 10:29 - 10:34
    keen ball off pole moving pole base off
  • 10:34 - 10:36
    the line
  • 10:37 - 10:40
    knocking pull over
  • 10:40 - 10:44
    chains leaving the ground
  • 10:45 - 10:48
    passing polls with the chains off the
  • 10:48 - 10:50
    ground
  • 10:53 - 10:56
    test weight touching the ground
  • 10:57 - 11:00
    circumventing the course
  • 11:05 - 11:09
    exceeding optimum time
  • 11:10 - 11:13
    once task 3a is complete the practical
  • 11:13 - 11:15
    examiner will provide you an opportunity
  • 11:15 - 11:17
    to reposition the block over the test
  • 11:17 - 11:19
    weight but you will not be permitted to
  • 11:19 - 11:21
    pick the test weight back up prior to
  • 11:21 - 11:26
    the start of task 3b for task 3 be at
  • 11:26 - 11:28
    the examiner's indication to start at
  • 11:28 - 11:31
    which point timing will begin lift the
  • 11:31 - 11:33
    test weight from the stop circle and
  • 11:33 - 11:35
    travel back through the corridor in a
  • 11:35 - 11:37
    reverse direction
  • 11:38 - 11:40
    remember to avoid touching or knocking
  • 11:40 - 11:42
    over any part of the PVC barriers
  • 11:42 - 11:44
    touching the ground with the test weight
  • 11:44 - 11:47
    or raising it so high that the chain
  • 11:47 - 11:49
    leaves the ground
  • 11:49 - 11:52
    remember also that all point deductions
  • 11:52 - 11:55
    listed in task 3 a will apply during
  • 11:55 - 11:57
    task 3b
  • 11:57 - 12:00
    timing will end when you have placed the
  • 12:00 - 12:02
    test weight completely inside the test
  • 12:02 - 12:04
    weight circle and the examiner has given
  • 12:04 - 12:07
    you a stop signal
  • 12:08 - 12:14
    tasks for safe securing procedures this
  • 12:14 - 12:16
    task is intended to evaluate your
  • 12:16 - 12:18
    knowledge of the proper procedures
  • 12:18 - 12:22
    required to safely secure the crane
  • 12:22 - 12:24
    the examiner will ask you to describe
  • 12:24 - 12:26
    the procedures you would apply to the
  • 12:26 - 12:30
    crane in preparation to leave the crane
  • 12:33 - 12:36
    after the exam please do not ask the
  • 12:36 - 12:38
    examiner to review your score sheet or
  • 12:38 - 12:40
    discuss your performance because they
  • 12:40 - 12:43
    are not permitted to do so
  • 12:43 - 12:45
    your results will be sent to you within
  • 12:45 - 12:47
    12 business days after receiving your
  • 12:47 - 12:49
    score sheet
  • 12:49 - 12:52
    if you have completed all your tests you
  • 12:52 - 12:56
    must leave the test site otherwise you
  • 12:56 - 12:58
    should return to the pretest briefing
  • 12:58 - 13:02
    area thank you for participating in the
  • 13:02 - 13:04
    NCCC o tower crane operator
  • 13:04 - 13:08
    certification program
  • 13:13 - 0:00
    you
Title:
Sandbox
Description:

You can use this Sandbox to try out things with the Amara tool.

The video that is primarily streaming here is http://www.youtube.com/watch?v=ZU2kyr9jRkg , which is completely blank. But you can go to the URLs tab to add the URL of another video and make it primary.

Please remember to download your subtitles if you want to keep them, as they will get deleted - and the streaming URL reverted to the blank video if you changed it - after a week or two,

more » « less
Video Language:
English
Team:
Captions Requested
Duration:
01:46:39
Claude Almansi edited English subtitles for Sandbox
Claude Almansi edited English subtitles for Sandbox
Claude Almansi edited English subtitles for Sandbox
Claude Almansi edited English subtitles for Sandbox
Claude Almansi edited English subtitles for Sandbox
koma edited English subtitles for Sandbox
koma edited English subtitles for Sandbox
Claude Almansi edited English subtitles for Sandbox
Show all
  • Revision 1 = provided subtitles for Lecture 1.2 of Prof. Scott Plous' Social Psychology course

  • Revision 1 = provided subtitles for Lecture 1.2 of Prof. Scott Plous' Social Psychology course

  • Revision 1 = provided subtitles for Lecture 1.2 of Prof. Scott Plous' Social Psychology course

English subtitles

Incomplete

Revisions Compare revisions