0:00:07.812,0:00:11.145 Welcome to this "VMC Leveling" video 0:00:11.145,0:00:16.628 This VF-2SS is connected to air and power and is operational 0:00:16.628,0:00:19.912 however, the machine is not at the proper height or level 0:00:19.912,0:00:23.890 to provide optimal performance and accuracy 0:00:23.890,0:00:26.929 There are three steps to the leveling process 0:00:26.929,0:00:31.578 First, the machine is positioned at the correct height above the coolant tank 0:00:31.578,0:00:34.679 Second, level the machine front to back 0:00:34.679,0:00:38.844 and side to side to permit good coolant and chip flow 0:00:38.844,0:00:43.698 Finally, remove any Twist or Bow in the base casting 0:00:43.698,0:00:46.862 The tools needed for this procedure are: 0:00:46.862,0:00:51.028 a three quarter inch (3/4") socket and ratchet, a one and a half inch (1 ½") wrench 0:00:51.028,0:00:55.528 a tape measure, a 5 tenths or 1 micron test indicator 0:00:55.528,0:00:58.044 and a magnetic base to mount the indicator 0:00:58.044,0:01:01.545 and Haas Leveling Tool T-2181 0:01:01.545,0:01:06.994 A precision machinists level is also acceptable for taking level measurements 0:01:06.994,0:01:09.961 This video features a VF-2SS 0:01:09.961,0:01:14.346 but the same procedures apply to all VF Series machines 0:01:14.346,0:01:18.145 Larger machines with outrigger supports require additional steps 0:01:18.145,0:01:20.112 during the leveling process 0:01:20.112,0:01:22.078 This information can be found in the Haas 0:01:22.078,0:01:24.202 machine Installation manual 0:01:24.202,0:01:26.327 To clear the coolant tank 0:01:26.327,0:01:30.127 lift the Base Casting three and a half (3 ½") inches off the ground 0:01:30.127,0:01:36.095 by adjusting the four corner leveling screws to the same height 0:01:36.095,0:01:37.419 On base castings with 0:01:37.419,0:01:41.478 6 or 8 leveling screws the middle screws should not be touching 0:01:41.478,0:01:45.227 the pads during the leveling procedure 0:01:45.227,0:01:50.076 Move the X and Y axes until the table is centered 0:01:50.076,0:01:54.362 Clean the table surface and the leveling tool 0:01:54.362,0:01:58.293 Make sure the calibration of your level is correct before starting 0:01:58.293,0:02:01.763 Place tool T-2181 on the mill table 0:02:01.763,0:02:06.412 and monitor the exact position of the bubble on the precision vial 0:02:06.412,0:02:08.528 Using a t-slot for alignment 0:02:08.528,0:02:14.845 rotate the level 180 degrees and place it in the same position on the table 0:02:14.845,0:02:18.111 The bubble should stay in the exact same position 0:02:18.111,0:02:21.097 If the values are different by more than one division 0:02:21.097,0:02:25.263 then the level should be returned to Haas for adjustment 0:02:25.263,0:02:27.695 With the leveling tool at the center of the table 0:02:27.695,0:02:33.061 and the short leveling vial parallel to the Y-axis, the shorter vial is measuring the angle 0:02:33.061,0:02:36.928 of the machine front to back 0:02:36.928,0:02:41.211 Lift either the front or back of the base casting as necessary 0:02:41.211,0:02:43.112 to make the machine level 0:02:43.112,0:02:45.013 Remember to always lift the 0:02:45.013,0:02:49.128 lower end of the machine to maintain clearance to the coolant tank 0:02:49.128,0:02:52.546 Each time you make an adjustment turn both leveling screws 0:02:52.546,0:02:55.711 on that end an equal amount 0:02:55.711,0:02:58.943 Adjust the screws until the bubble is centered 0:02:58.943,0:03:04.911 Adjustments close to zero will make subsequent changes easier 0:03:04.911,0:03:09.412 With the machine leveled front to back, use the longer precision level 0:03:09.412,0:03:12.499 lying along the X-axis, which shows the angle 0:03:12.499,0:03:16.478 of the machine from left to right 0:03:16.478,0:03:20.429 Again, lift the lowest side of the machine to bring it level 0:03:20.429,0:03:23.714 and turn both screws an equal amount 0:03:26.330,0:03:28.191 With the machine now level 0:03:28.191,0:03:30.716 front to back and side to side 0:03:30.716,0:03:36.245 continue using the longer vial parallel to the X-axis 0:03:36.245,0:03:39.962 We are now ready to check for twist in the base casting 0:03:39.962,0:03:43.478 Start with the mill table at the front of the machine 0:03:43.478,0:03:46.174 look at the position of the indicating bubble 0:03:46.174,0:03:51.251 Move the Y-axis across its full travel stopping at the column 0:03:51.251,0:03:55.077 At the column side, look to see which rear corner of the machine 0:03:55.077,0:03:59.429 if any, is lowest as shown by the leveling tool 0:03:59.429,0:04:02.395 In this video, the leveling tool is angled down 0:04:02.395,0:04:08.047 at the right rear corner of the machine as we get to full axis travel at the column 0:04:08.047,0:04:11.578 This shows the right rear corner of the machine is low 0:04:11.578,0:04:15.728 The value is three marks away from zero 0:04:15.728,0:04:18.347 Lift the right rear corner of the machine 0:04:18.347,0:04:23.228 until the leveling tool reads zero 0:04:23.228,0:04:25.980 Now move the table to the front of the machine 0:04:25.980,0:04:28.789 and note which side is lowest 0:04:28.789,0:04:34.044 Adjust the lowest corner up until the leveling tool reads zero 0:04:34.044,0:04:38.628 Move the table across travel and each time adjust the leveling tool value 0:04:38.628,0:04:43.712 to zero by lifting the low corner of the machine 0:04:43.712,0:04:46.277 Usually the value will change several times 0:04:46.277,0:04:49.439 and get nearer to zero with each adjustment 0:04:49.439,0:04:56.612 Repeat this step until the bubble is adjusted to zero at both ends of the Y-axis travel 0:04:56.612,0:05:01.495 Next, adjust the middle leveling screws until lowered onto the leveling pucks 0:05:01.495,0:05:06.603 Hand-tighten each screw onto the puck until the puck stops turning 0:05:06.603,0:05:11.837 Set each screw by tightening an additional 10 degrees 0:05:11.837,0:05:13.911 With the middle screws tight the remaining 0:05:13.911,0:05:18.096 steps in this process are: Re-measuring for Twist 0:05:18.096,0:05:20.753 and measuring for Bow in the base casting 0:05:20.753,0:05:23.259 and then measuring the Spindle Sweep. 0:05:23.259,0:05:28.862 Any adjustments from this point forward will be done with the middle screws ONLY 0:05:28.862,0:05:32.430 with both middle screws adjusted the same each time[br] 0:05:32.430,0:05:36.510 These adjustments should be very small as we are almost finished 0:05:36.510,0:05:42.144 With the leveling tool still parallel to the X-axis, re-measure for twist 0:05:42.144,0:05:44.493 Start at the operator side 0:05:44.493,0:05:48.163 move to the middle of Y-axis travel 0:05:48.163,0:05:51.895 and then to the Column side 0:05:51.895,0:05:57.444 Adjust the middle screws to remove any twist caused when the screws were tightened 0:05:57.444,0:05:59.980 Again, ONLY very small adjustments 0:05:59.980,0:06:07.430 should be made to the middle screws while re-measuring the level values 0:06:07.430,0:06:11.429 Next, measure for any bow, either up or down 0:06:11.429,0:06:13.652 along the length of the Base Casting 0:06:13.652,0:06:16.947 Place the Leveling Tool in the center of the Mill Table 0:06:16.947,0:06:21.826 with the precision vial parallel to the Y-axis 0:06:21.826,0:06:25.328 Look at the bubble position at the operator side 0:06:25.328,0:06:28.729 at the middle of Y-axis travel 0:06:28.729,0:06:31.545 and at the Column side 0:06:31.545,0:06:36.677 If the measurement shows there is bow in the base casting in either the up or down direction 0:06:36.677,0:06:41.561 use the middle screws to make adjustments 0:06:41.561,0:06:43.976 Remember, only move the screws 0:06:43.976,0:06:47.244 in small and equal amounts 0:06:47.244,0:06:49.944 The tolerance for both the twist and bow measurements is 0:06:49.944,0:06:57.477 0.0002" over 10" or 0.02mm over a meter 0:06:57.477,0:06:59.811 Errors because of twist or bow will cause 0:06:59.811,0:07:02.624 errors in the spindle tram values 0:07:02.624,0:07:08.845 With the twist and bow adjustments complete carefully remove the leveling tool 0:07:08.845,0:07:12.945 Attach the Test Indicator to the Magnetic Base 0:07:12.945,0:07:17.370 Move the spindle head down to the middle of Z-axis travel 0:07:17.370,0:07:21.397 Attach the magnetic base to the spindle 0:07:21.397,0:07:27.958 Position the test indicator to measure a 10" or 250mm diameter circle 0:07:27.958,0:07:31.429 Move the table to a position where the test Indicator tip 0:07:31.429,0:07:34.278 will remain on the table's surface when facing both the 0:07:34.278,0:07:37.262 front and column sides of the machine 0:07:37.262,0:07:42.976 Moving the Z-axis in "tenths" mode, bring the Test Indicator down to contact the 0:07:42.976,0:07:46.328 mill table and zero the test indicator 0:07:46.328,0:07:49.818 Take a measurement every 90 degrees of rotation 0:07:49.818,0:07:53.354 This provides two values along the Y-axis 0:07:53.354,0:07:56.136 and along the X-axis 0:07:56.136,0:07:58.795 Total Indicator Reading for all four positions 0:07:58.795,0:08:05.161 should not exceed 0.0005 inches or 0.013 mm 0:08:05.161,0:08:06.979 If the spindle sweep is not within 0:08:06.979,0:08:10.494 specification along the Y-axis, we can use the 0:08:10.494,0:08:14.299 middle screws to make very small adjustments to the sweep readings 0:08:14.299,0:08:18.491 while changing the bow and twist values by a negligible amount 0:08:18.491,0:08:22.007 Each time you make a middle screw adjustment to change spindle sweep 0:08:22.007,0:08:25.653 be sure to re-zero your test indicator at the operator side 0:08:25.653,0:08:28.839 before re-measuring the effect of your adjustment 0:08:28.839,0:08:32.610 This will minimize the chance of confusing values 0:08:32.610,0:08:35.041 In this video the test indicator starts 0:08:35.041,0:08:38.140 with a value of 0 facing the front of the machine 0:08:38.140,0:08:41.670 We see 0.0001 at the right hand quadrant 0:08:41.670,0:08:44.682 -0.0002 at the back side of the table 0:08:44.682,0:08:48.920 and 0.0002 at the left hand quadrant 0:08:51.351,0:08:54.789 If the value at the back had been out more than 0.0005 0:08:54.789,0:08:56.328 a very small adjustment 0:08:56.328,0:08:58.031 to the middle leveling screws 0:08:58.031,0:09:01.395 to either lift or drop the table would be required 0:09:01.395,0:09:05.112 Only the values from front to back can be effectively changed 0:09:05.112,0:09:09.354 by adjustment of the middle leveling screws 0:09:09.354,0:09:13.012 If the adjustments to make spindle sweep better are very small 0:09:13.012,0:09:15.978 you don't need to check bow and twist again 0:09:15.978,0:09:18.395 Lock the leveling screws in place 0:09:18.395,0:09:24.447 Tighten the locking nuts while holding the leveling screws so they don’t rotate 0:09:24.447,0:09:27.145 The customer's machine is now at the proper height 0:09:27.145,0:09:31.077 and level and is free of any twist or bow in the base casting 0:09:31.077,0:09:35.806 This provides the basis for optimal machine accuracy